Description
usually with 18 tasks each and corresponding answer sheets
Installation depth 25 mm
If this period is exceeded
Mast-mounted (Mini-Contest)
The installation diameter is 92 mm and the installation depth is 78 mm
SELDÉN Gasdruckfeder type:20 usually with 18 tasks eachRule of thumb for choosing a gas spring for a rod kicker: Top rigged yachts should choose the weaker spring. Partial rigs with a relatively long main boom require the stronger version.